Subcontractors
wanted.
For the fibre roll-out in the Neckar-Alb region we are looking for crews and specialist companies, from the cable trench to the asphalt. Continuous call-offs, scope fixed before the start, payment on checked measurement.
What we are looking for
-
Cable civil works crews
Cable trenches, conduit, sand bed, warning tape, backfill in layers and compaction. With your own crew and experience in fibre roll-out.
-
Excavation companies
Excavation, earthmoving and building pits with your own machinery, per project or on continuous call-off.
-
Asphalt and paving
Closing surfaces after cable laying: base course, asphalt, paving, kerbs.
-
Directional drilling and trenching
Trenchless installation and micro-trenching, per project, when ground or surface call for it.
What you can expect
-
Continuous call-offs
We build fibre all year. Good work gets the next section, not just a one-off job.
-
Scope fixed before the start
Scope, interfaces and handover points are in writing before the first excavator moves.
-
Payment on measurement
Jointly checked measurement, short payment terms, no renegotiation after acceptance.
-
One contact
You talk to our site management, in German, English or Croatian.
What we need
We check these documents before the first assignment. They do not have to be complete at first contact.
-
Trade registration or commercial register extract
The company exists and the activity is registered.
-
Exemption certificate under § 48b EStG
Otherwise we have to withhold 15 percent German construction withholding tax.
-
Public liability insurance
With cover for civil works, proven by the insurer's confirmation.
-
Clearance certificates
Health insurance, BG BAU and, where applicable, SOKA-BAU.
-
For posted workers
A1 certificates and proof of minimum wage.
-
References
Comparable works from recent years, ideally with photos.
How it works
-
1 · Introduction
Via the form below or by phone: trades, capacity, working area.
-
2 · Conversation
We clarify scope, prices and open questions, usually within a week.
-
3 · Trial section
A first section on a running site, together with our crew.
-
4 · Framework agreement
Then regular call-offs with fixed scope and fixed payment terms.